Case Description |
|
| Because of the four - storey warehouse's physical conditions, the productsare justly transfered interfloor by rental cars from outside of the warehouse. Therefore,
|
 |
In warehouse, tranfering costs are extremely high |
|
 |
Input and dispatching costs are high |
|
 |
Especially time wasting is too much in dispatching area |
|
 |
In intensive dispatching periods, thence of not moving the goods easily and speedly, excess demand from retailing shops could not be met, delays in transportation and goods could not be dispatched on time. |
|
 |
According to future planning and growing, if the need of infloor transfer is too much, the established automation system should give an answer. |
|
 |
In new established similar warehouse, similar system is needed for infloor transfer of goods. |
|
 |
SOLUTION |
|
| As a solution of above cases, the best and easy way for infloor transfer of goods and future plans of the customer, it is decided to have a vertical lifting system; in otherwords pallett lift.
|
 |
The lift's Access moduls will run as two different units and they will be managed by two individual moving motors. Therefore it is achieved to avoid the products waiting in the line and undertake of goods easily and seamlessly to the lift. |
|
 |
For user's manuel intervention of pallets positioning, each controlling unit has been constructed. |
|
 |
For user's manuel intervention of pallets positioning, each controlling unit has been constructed in entering area of each floor. |
|
|
|
 |
CONCLUSION |
|
| In conjunction with finalization of the Project, these advantages are followed;
|
 |
By two vertical lifting systems, goods transfer infloor could be done very easily and speedly. |
|
 |
Established private programme (SCADA), each movement in the system could be followed, defects could be observed immediately, management reports could be taken easily such as daily or within specified time period how many transport is done infloors. |
|
 |
Car rental costs are disappeared. |
|
 |
Cost of input and dispatching is declined. |
|
 |
As system has programmed by priority of LCW, effectiveness of movements in warehouse. |
|
 |
The return of investment has been calculated as 6 months. |
|
 |
By transfering the goods more speedly, delays are declined. |
|
 |
In Turkey, it's the first of 100% local vertical carrying system has established. |
|